
FEES AND TARIFFS
1.
Charge on a vessel, other than described below, at float or dock, per day of part thereof:
a) per day or part thereof:
per metre
2.50
Charge on Canadian commercial fishing vessel moored at a float or elsewhere, or on a vessel not engaged in commercial activity, moored elsewhere than at a float, per day or part thereof:
2.
Daily:
Seasonal Fisher:
Seasonal Permit (requiured):
(a) per metre a day or part thereof
25.00
850.00
30.00
Commercial vessel engaged in cargo activity:
Commercial or Government vessel with no cargo or passenger activity, per meter a day or part thereof:
Minimum berthage charge:
3.
4.
5.
2.50
15.00
50.00
Rate in Dollars
Description
Fees and Tariffs - Effective from June 2023
Berthage
1.
The charge payable for each entry of a vessel entering the Port of Summerside, per gross registered tonne, in the case of a vessel:
0.09
Rate in Dollars
Description
Harbour Maintenance Fees
1.
Interior storage
4.00
4.00
per month per tonne
per sq m/day
drop-charge
0.25
Bulk storage
(inside transit shed)
Exterior storage
2.
3.
Rate in Dollars
Description
Storage Fees
Rate in Dollars
Description
1.
Passenger charges in respect of a continuous voyage:
8.50
Cruise Ship Passengers
1.
Not Otherwise Stated:
3.64
2.96
(b) per m3
(a) per tonne
1.17
Sand, gravel, stone, lime, limestone
3.
Fertilizer
Grain, Grain Products
Salt in bulk
Other Dry Bulk Commodities
per tonne
4.
5.
6.
7.
per tonne
per tonne
3.64
(a) per tonne
1.67
1.25
1.13
1.30
Rate in Dollars
Description
Wharfage and Transfer Charges
1.
Electricity, water, garbage disposal, sewage disposal, snow removal, wharf cleaning
50.00 hook-up plus $30/hour
35.38
Cost plus 30%
4.
2.
Water – hourly (3 hour minimum)
Bunkering, per litre
Security
3.
0.05